Adaptive Reuse 1100 WILSHIRE
Los Angeles, California

Full mechanical, electrical, plumbing & fire protection design for an adaptive reusedaptive reuse of an existing office building to approximately 230 live work condominiums with attendant facilities, parking, retail and potential for future restaurant.
PROJECTS Adaptive Reuse

Hoxton Hotel
Mechanical, Electrical and Plumbing design for an existing historic office building consisting of approximately 80,000 sq. ft. of office tower in 10 floors plus basement and roof to be converted to a boutique hotel of approximately 165 keys with food & beverage and function space. Amenities to include rooftop pool, indoor & outdoor roof lounge and restaurant, basement and ground floor restaurants and bar.

ACE Hotel and UA Theater
Mechanical, Electrical and Plumbing design for an existing historic office building and theater consisting of approximately 94,000 sq. ft. of office tower in 13 floors to be converted to a boutique hotel of approximately 185 keys with food & beverage, function space along with the existing theater. Scope to be included for the Theater includes new “Bar’s” in Mezzanine and Projection Room, upgrade and modifications to HVAC system based on a Music Venue, upgrade Screening Room in Cellar and upgrade to Bathrooms. Amenities to include rooftop pool, indoor & outdoor roof lounge in addition to those listed above. This project is complete and occupied.

Roosevelt, Los Angeles, California
Full design of mechanical, plumbing, electrical and fire protection systems for an adaptive reuse of an existing high-rise office building converted to “For Sale” lofts. Approximately 222 loft units along with approximately 10 retail spaces and subterranean parking.

The Presidio Landmark, San Francisco, California
LEED Gold design for the mechanical, plumbing and electrical system’s, and design build of the fire protection systems for an adaptive reuse from an historical hospital to a154 high end rental apartments and was opened on September 25, 2010.

Subway Terminal, Los Angeles, California
Full mechanical, plumbing, electrical and fire protection design for an adaptive re-use of an existing 12-story historical building including development of the 3rd floor through roof levels as apartments and a new three level parking structure.

801 South Grand Avenue, Los Angeles, California
Full mechanical, plumbing and electrical design for a 22-story office building consisting of approximately 440,000 square feet of office space and 10,000 square feet of ground floor retail space.

Washington Square, Venice, California
Full mechanical, electrical, plumbing & fire protection design for an adaptive reuse and modification of an existing 9 story office building to live work 42 units, addition of 30 podium flats and 52 3-story townhomes with commercial and recreation areas and a two level parking structure.

655 South Hope Condominium, Los Angeles, California
Design of the mechanical, plumbing, electrical and fire protection systems for an 80 unit condominium conversion of an existing high rise office building including conversion of parking areas to smoke controlled zones.  Provide for new retail restaurants on the ground floor.

3800 Wilshire, Los Angeles, California
Conversion of existing single 22 story office tower from office building to condominium.


Hoxton Hotel

ACE Hotel and UA Theater

ACE Hotel and UA Theater

Roosevelt, Los Angeles, California

The Presidio Landmark, San Francisco, California

Subway Terminal, Los Angeles, California

655 South Hope Condominium, Los Angeles, California
Home | Profile | About Us | Projects | Contact Us